Skip to content

Home addition

Hoover residence: addition, then kitchen

A home office for a family with six boys, and a kitchen with load-bearing columns in the middle of it. Two projects, months apart. They called us back for the second one.

Tall white kitchen cabinets with pantry and coffee nook beside open living area, Austin, TX home
Lifetime Warranty on Craftsmanship seal
Location
Williamson County
Type
Two projects: side addition, then kitchen remodel
Phase 1
Home office, enlarged laundry, secondary guest bath · drainage remediation · foundation stabilization
Phase 2
Kitchen remodel: load-bearing columns removed, single large island
Gap between phases
A few months

Phase 1, the addition

We’ve actually done two projects for this family. The first was when the husband needed a quiet downstairs office. He worked from home part of the time, and with six boys in the house, you can imagine how chaotic it could get. Despite the busyness, they were such a wonderful family to work with.

We added onto the side of the home, off what was effectively a dining area: an office, a larger laundry room they badly needed, and a secondary guest bathroom.

The part that had to happen first

My primary concern on this project had nothing to do with the office.

The lot sloped, and water was draining toward the house. Then we were proposing to extend the house out in the direction the drainage pattern already ran.

Build that addition without touching the water drainage and you’ve created a permanent problem with a new foundation sitting in it.

So before anything else: excavation work, a berm built, and a bobcat to get it moving. First and foremost we corrected the drainage so it pushed water away from the new build. Then we started.

There were also two large trees that had to come out. Took those out. And then, because of the soil instability since the trees were there, we had to do a little extra work to solidify the foundation on this. It turned out to be a great project.

Matching what was already there

We worked tirelessly to source the same brick and the same stone as the original house, and kept consistent with the existing windows.

An addition that looks like an addition is a failure, even if the work inside it is perfect. This one matches well enough that you have to be told where the seam is.

The bookcase in the office

The favorite detail on this phase. He asked us to build a hiding bookcase in his office for his books, a bookcase on hidden hinges that you push and it opens, with a storage area behind it for personal items.

Everybody wants one of these. Not everybody asks.

Phase 2, the kitchen, a few months later

A few months later, we came back for our second project with them: a complete kitchen remodel.

The original layout was heavily chopped up by partition walls and support columns. We were able to remove those structural supports and open up the entire space, creating room for a massive central island with plenty of surrounding prep space. It made a huge difference for them, especially during busy family dinners.

Removing the columns

The columns were structural, so eliminating them meant real structural work to carry the load elsewhere. I enjoyed that part, which by now won’t surprise anyone.

What it bought was one huge island with genuine workspace to move around it, instead of a room you navigated.

The rest of it

New countertops, and these are beautiful. The stone is called Taj Mahal, which tells you roughly how elegant it looks.

Upgraded appliances, and we rearranged a few things to give her more space. All new cabinets with self-closing doors and drawers, plus some glass-fronted cabinetry to display the pieces she wanted visible.

The flooring, and where I was wrong

We only had to redo part of the flooring, which is either lucky or a problem depending on your flooring contractor.

I was a little apprehensive at the beginning about blending new flooring into old. It’s the kind of thing that looks fine in the showroom and obvious in the finished room. But we had an exceptional flooring guy who mixed the old back in with the new seamlessly.

It turned out well. My doubts were about the difficulty, not about him, and he was right and I was worried.

The result

An office with a hidden door, a laundry room that fits the family, a guest room, bath, and a kitchen you can cook in with eight people in the house.

And a drainage pattern that now runs away from the building instead of into it, which is the part nobody will ever notice, and the reason the rest of it will still be fine in twenty years.

Details and materials

Phase 1, side addition: home office, enlarged laundry, secondary guest bathroom · drainage rerouted with excavation and a new berm · foundation stabilization after mature tree removal · brick and stone matched to existing · windows matched to existing · hidden bookcase door with concealed storage.

Phase 2, kitchen: load-bearing columns removed with structural reinforcement · partition walls opened · single large island · Taj Mahal countertops · new appliances · full cabinetry with self-closing doors and drawers · glass-fronted display cabinetry · partial flooring replacement blended into existing

Kitchen with white cabinets to the ceiling, a marble slab backsplash, a pot filler and a double range

Request an estimate

Adding on, or opening up a kitchen that fights you?

Tell us about your project. We walk the space, look underneath, and take you through the estimate line by line. Or call (512) 677-3992.